Mobicom 45 | Mobile Concrete Batching Plant

CONSTMACH MOBICOM 45 Mobile & Compact & site type concrete batching plant is an ideal solution for the projects that require high mobility, temporary production area and low investment budget. Unlike conventional mobile concrete plants, the MOBICOM 45 concrete plant can be shipped in a single 40-foot container. It requires minimal site preparation, and no mobile crane is needed for installation. A loader is all that is needed. The facility can be easily transported between job sites by truck. To ensure easy mobility, MOBICOM concrete plants remain at the same position during both production and transport. Since the mixer is just above the ground level, produced concrete is transferred to truck mixer by a conveyor belt. The MOBICOM 45 concrete batching plant requires minimal site preparation. A level surface capable of supporting the plant’s total weight is sufficient.

TRANSPORT POSITIONTRANSPORT POSITION
INSTALLED POSITIONINSTALLED POSITION

The MOBICOM 45 construction-site-type mobile concrete plant is equipped with all the necessary equipment for concrete production, except for a cement silo; however, if cement is supplied in bags, the cement bag-opening hopper and cement transfer system located on the plant’s chassis are used instead of a cement silo. In case of need, MOBICOM 45 can be equipped by also a cement silo.

CEMENT BAG OPENING HOPPERCEMENT BAG OPENING HOPPER
CEMENT SILOCEMENT SILO

Single shaft, pan or planetary type mixers can be used in MOBICOM 45 so that it could be used for different purposes such as ready mixed concrete, dry mixed concrete, precast concrete production etc.

SINGLE SHAFT MIXERSINGLE SHAFT MIXER
PLANETARY MIXERPLANETARY MIXER
PAN MIXERPAN MIXER

Thanks to the optimized aggregate feeding height of MOBICOM 45, ramp for loaders to charge aggregate to the hopper is not required. A loader can feed the hopper directly from ground level easily.

MOBICOM 45 is equipped with high-tech automation system including top class SIEMENS & SCHNEIDER brand electronic components and PLC. The entire system is controlled by advanced software featuring sophisticated capabilities and a user-friendly interface.

FULL AUTOMATIC CONTROL SYSTEM

The overall dimensions of the MOBICOM 45 have been designed to comply with international road transport regulations, and it can be easily transported between construction sites.

Mobicom 45 Technical Specifications

Production Capacity45 m³/h
Sizes in Transport Position8(L) x 2.3(W) x 2.5(H) meters
Weight9.5 tons
Total Motor Power55 kW
Required Electric Generator80 kVA
Mixer OptionsSingle Shaft - Planetary
Required area to operate200 m²
Aggregate Hopper Volume4 x 6 m³
Aggregate Weighing Hopper0.75 m³
Aggregate Transfer Conveyor800 x 4.000 mm
Mixer Wet Concrete Volume0.75 m³
Cement Weighing Hopper450 kg
Water Weighing Hopper300 lt
Additive Weighing Hopper20 lt
Air Compressor300 lt, 4 kW
Cement SiloOptional from 50 to 200 tons capacity.
Control TypeFULLY AUTOMATIC

Mobicom 45 Transport

Mobicom 45 transport position

Mobicom 45Video

Mobicom 45 General Layout

FAQ

MOBICOM 45 is purchased by contractors who follow projects across multiple sites in a single season — highway construction crews, regional precast distributors, and ready-mix operators serving short-term jobsite contracts. The mobile chassis is the key advantage: a project that lasts 6 months no longer requires a 3–4 week site-preparation phase before first concrete production. MOBICOM 45 is on site and producing within hours of arrival.

What MOBICON 45 Produces

MOBICOM 45 produces ready-mixed concrete at a rated capacity of 45 m³/h. The configurable mixer (selected at the engineering stage) covers ready-mix concrete (low and high slump), dry-mix concrete, precast feedstock and specialty mixes. The chassis-mounted cement silo (as specified) holds enough stock for typical jobsite operation; external silos are added where higher buffer capacity is required.

Suitability Factors

MOBICOM 45 suits jobsites with: a flat load-bearing pad of approximately 200 m², road access for the single-trailer delivery, electrical supply matching 80 kVA, and water supply. Sites without these basics still benefit from the mobile design — temporary supply (diesel generator, water bowser) can be provided alongside, and Mobicom 45 starts producing while permanent utilities are being installed.

Operating Considerations

MOBICOM 45 requires standard maintenance — daily walkaround checks, weekly grease points, monthly wear-plate inspection, quarterly overhauls. The road-legal chassis dimensions (8(L) x 2.3(W) x 2.5(H) meters) allow movement between jobsites without disassembly and without special-load permits in most countries. Movement preparation is typically a single shift: drain the cement silo, disconnect utilities, fold any extendable elements, drive away.

Comparison To Alternatives

Compared to stationary plants, MOBICOM 45 sacrifices peak capacity for mobility — for projects that move every 6–12 months, the lifetime cost-per-cubic-metre is lower despite the higher capital cost. Compared to compact stationary plants, Mobicom 45 eliminates the foundation pad and is genuinely transportable as a single unit. For projects that stay on one site for multiple years, a stationary or compact plant is generally more economical.

Frequently Asked Questions

whatsapp gorsel 2024 01 10 saat 15 28 30 bf9fc1cb 9474
Quick Contact

Leave a request, and our expert team will as soon as possible get back to you

Fill out the form for detailed information about concrete plants, crushing-screening plants, or our other products — or contact us directly.

By leaving a request, you consent to the processing of your personal data.

or directly

What's new on Constmach

Our expert team is ready to provide a solution tailored to your project. We're just a phone call away — call us now.